Go Slow to Go Fast Means Sometimes Going Full Stop | S2 The EBFC Show 020 (clip)

Frank strives to create an environment of constant learning on his projects. His experiences with pull planning and the Last Planner System go beyond one size fits all approaches that often fail. Subscribe to never miss new videos here: https://rb.gy/q5vaht. When building steel conditions became unsafe and not clean, Frank paused the work so the team could engage directly with the trades to enable the needed changes. The results are undeniable.

He represents a growing number of construction superintendents that openly embrace Lean and actively work towards greater collaboration, patience, respect, flexibility, accountability, and use of technology.

The Easier, Better, for Construction Show is where people working to make building easier and better share how. Frank is committed to making construction easier and better and made numerous contributions to The Lean Builder Blog and The Lean Construction Blog.

Connect with Frank via
LinkedIn at https://www.linkedin.com/in/frank-coln-leed-a-p-724200101/
The Lean Builder Blog Posts:
https://theleanbuilder.com/construction-superintendent-2-0-update-and-reboot/
https://theleanbuilder.com/boost-your-constraint-management-skills/
The Lean Construction Blog Posts:
https://leanconstructionblog.com/Enhancing-A3-Problem-Solving-with-Technology.html
https://leanconstructionblog.com/The-step-we-often-overlook-when-implementing-the-Last-Planner-System.html

Connect with Felipe via
LinkedIn at https://www.linkedin.com/in/engineerfelipe
Twitter at https://twitter.com/felipe_engineer
Instagram at https://www.instagram.com/thefelipeengineer